Skip to content

Contact.

Order Procedure & Progress

Step 1️⃣: Share Rough Door Measurements
Take a photo of your door opening and provide the approximate measurements to us.

Β Includes:

β€’ πŸ“ Width (W) – left to right of the door opening

β€’ πŸ“ Height (H) – floor to top of opening

β€’ πŸ“· Photo taken straight in front of the door opening

Step 2️⃣: Choose Your Door Receive Quotation
Our team will prepare a price estimate based on the information provided.

Step 3️⃣: Confirm with Deposit
Proceed with a 10% deposit or minimum RM150 to confirm your order.
Note: Deposit is non-refundable if the order is cancelled.

Step 4️⃣: On-Site Measurement
We will arrange a site visit to take accurate door measurements.

Step 5️⃣: Full Payment
Settle the remaining balance after measurements are confirmed.

Step 6️⃣: Door Production (Approx. 4 Weeks)
Your door will be processed and manufactured according to specifications.

Step 7️⃣: Installation Arrangement
Our team will schedule and carry out the installation.

Step 8️⃣: Final Site Inspection
A final inspection will be conducted after move-in to ensure everything is in perfect condition.

Headquarters

NO 7, Jalan 8/1D, Jalan Sultan, Petaling Jaya, 46050, 46200 Petaling Jaya, Selangor

General inquiries

+60162722682

Email address

admin@mymaxxdoor.com